A+
A
B+
B
C
D
E
F
H
Property ID: 301281
A+
A
B+
B
C
D
E
F
H
Spa |
|
---|---|
Input Height (cm) | 220 |
Storehouse |
|
Storehouse (s.m.) | 20 |
Elevator |
|
Gym |
|
Floor |
|
Area configuration |
|
Double glazing |
|
Rooms |
|
Equipment |
|
Heating |
|
Property status |
|
Hotel Category |
|
Pool |
|
Input Width (cm) | 150 |
Fire detection |
|
Fire extinguishment |
|
Alarm |
|
Type Power |
|
Restaurant |
|
Services |
|
Natural Gas |
|
Beneficial Height | 2.9 |
Daily Price | 1 |
Percentage of Completeness | 1 |
Loading and unloading ramps | 0.01 |
Floor Strength kg/m2 | 1 |
Previous use |
|
Roof Garden |
|
---|---|
Label Capability |
|
Position |
|
Lawn | 1 |
Access |
|
Parking Type |
|
Facilities |
|
Security building |
|
Use Area |
|
Ability to Change Use |
|
---|---|
Type of Construction |
|
Energy Class |
|
Plans - Contracts |
|
Shared bills | 1 |
For exclusive offers, discounts, announcements
Description.
NAOUSSA HOTEL: The building consists of a basement where there are 3 staff rooms, address / reception area, engine room, storage areas and a space where provision has been made for the creation of a spa / gym. On the ground floor there are 2 suites (one of which has a private outdoor hot tub) and a restaurant / breakfast area with indoor and outdoor areas. There is also a space where provision has been made to create a two-room apartment. Upstairs there are 4 suites (both of which have a private outdoor hot tub). The quality of construction is excellent with premium materials that have been placed as the target of the accommodation is in the high-end travel market. Let me inform you that the tiles are of the Italian brand ABK, the batteries of Zanetti Chini, the basins of the ecological company Catalano, the Simmons mattresses that equip some of the best hotels in the world. Also, the space heating-cooling is done with DAIKIN VRV, the DHWs are provided with solar panels and a heat pump offering the maximum savings. All suites have the intelligent Legrand system installed which ensures high automation with lighting scenarios, energy management and other systems. Lighting automation has also been installed in the restaurant. The kitchen has been pre-installed for gas supply to save costs.